Reliant Building Solutions has been hard at work on an extensive parking garage repair at one of Atlanta’s prominent hospitals. The latest phase of the work requires us to remove pre-cast concrete panels from the top level of the deck. The pictures show RBS utilizing a crane to lower the panels. After we finish work on the concrete at the edge of the parking deck, we will lift the panels back up and re-connect them by welding them into place.