Reliant Building Solutions has completed another slab infill. This one was actually two slab infills side-by-side in what was previously the corporate office of one of Atlanta’s premier architectural firms. The photo shows the slab openings after finishes were demolished and it shows our foreman laying down the decking at the end of the job.
RBS performed a lot of work including coring 76 4-inch diameter holes, welding 76 nelson studs to steel beams, drilling 80 holes that were 21 inches deep and attaching angle steel to support the decking. After we de-mobilize, others will follow behind us to fireproof our steel and place concrete over the decking.